Introduction

Programmable controllers are generally programmed in ladder diagram (or "relay diagram") which is nothing but a symbolic representation of electric circuits. Symbols were selected that actually looked similar to schematic symbols of electric devices, and this has made it much easier for electricians to switch to programming PLC controllers. Electrician who has never seen a PLC can understand a ladder diagram.

Ladder diagram

There are several languages designed for user communication with a PLC, among which ladder diagram is the most popular. Ladder diagram consists of one vertical line found on the left hand side, and lines which branch off to the right. Line on the left is called a "bus bar", and lines that branch off to the right are instruction lines. Conditions which lead to instructions positioned at the right edge of a diagram are stored along instruction lines. Logical combination of these conditions determines when and in what way instruction on the right will execute. Basic elements of a relay diagram can be seen in the following picture.
PLC

  Most instructions require at least one operand, and often more than one. Operand can be some memory location, one memory location bit, or some numeric value -number.In a case when we wish to proclaim a constant as an operand, designation # is used beneath the numeric writing (for a compiler to know it is a constant and not an address.)

Based on the picture above, one should note that a ladder diagram consists of two basic parts: left section also called conditional, and a right section which has instructions. When a condition is fulfilled, instruction is executed, and that's all!
PLC

  Picture above represents a example of a ladder diagram where relay is activated in PLC controller when signal appears at input line 0. Vertical line pairs are called conditions. Each condition in a ladder diagram has a value ON or OFF, depending on a bit status assigned to it. In this case, this bit is also physically present as an input line (screw terminal) to a PLC controller. If a key is attached to a corresponding screw terminal, you can change bit status from a logic one status to a logic zero status, and vice versa. Status of logic one is usually designated as "ON", and status of logic zero as "OFF".

Right section of a ladder diagram is an instruction which is executed if left condition is fulfilled. There are several types of instructions that could easily be divided into simple and complex. Example of a simple instruction is activation of some bit in memory location. In the example above, this bit has physical connotation because it is connected with a relay inside a PLC controller. When a CPU activates one of the leading four bits 10, relay contacts move and connect lines attached to it. In this case, these are the lines connected to a screw terminal marked as 0 and to one of COM screw terminals.


Normally open and normally closed contacts

Since we frequently meet with concepts "normally open" and "normally closed" in industrial environment, it's important to know them. Both terms apply to words such as contacts, input, output, etc. (all combinations have the same meaning whether we are talking about input, output, contact or something else).

Principle is quite simple, normally open switch won't conduct electricity until it is pressed down, and normally closed switch will conduct electricity until it is pressed. Good examples for both situations are the doorbell and a house alarm.

If a normally closed switch is selected, bell will work continually until someone pushes the switch. By pushing a switch, contacts are opened and the flow of electricity towards the bell is interrupted. Of course, system so designed would not in any case suit the owner of the house. A better choice would certainly be a normally open switch. This way bell wouldn't work until someone pushed the switch button and thus informed of his or her presence at the entrance.

Home alarm system is an example of an application of a normally closed switch. Let's suppose that alarm system is intended for surveillance of the front door to the house. One of the ways to "wire" the house would be to install a normally open switch from each door to the alarm itself (precisely as with a bell switch). Then, if the door was opened, this would close the switch, and an alarm would be activated. This system could work, but there would be some problems with this, too. Let's suppose that switch is not working, that a wire is somehow disconnected, or a switch is broken, etc. (there are many ways in which this system could become dysfunctional). The real trouble is that a homeowner would not know that a system was out of order. A burglar could open the door, a switch would not work, and the alarm would not be activated. Obviously, this isn't a good way to set up this system. System should be set up in such a way so the alarm is activated by a burglar, but also by its own dysfunction, or if any of the components stopped working. (A homeowner would certainly want to know if a system was dysfunctional). Having these things in mind, it is far better to use a switch with normally closed contacts which will detect an unauthorized entrance (opened door interrupts the flow of electricity, and this signal is used to activate a sound signal), or a failure on the system such as a disconnected wire. These considerations are even more important in industrial environment where a failure could cause injury at work. One such example where outputs with normally closed contacts are used is a safety wall with trimming machines. If the wall doors open, switch affects the output with normally closed contacts and interrupts a supply circuit. This stops the machine and prevents an injury.

Concepts normally open and normally closed can apply to sensors as well. Sensors are used to sense the presence of physical objects, measure some dimension or some amount. For instance, one type of sensors can be used to detect presence of a box on an industry transfer belt. Other types can be used to measure physical dimensions such as heat, etc. Still, most sensors are of a switch type. Their output is in status ON or OFF depending on what the sensor "feels". Let's take for instance a sensor made to feel metal when a metal object passes by the sensor. For this purpose, a sensor with a normally open or a normally closed contact at the output could be used. If it were necessary to inform a PLC each time an object passed by the sensor, a sensor with a normally open output should be selected. Sensor output would set off only if a metal object were placed right before the sensor. A sensor would turn off after the object has passed. PLC could then calculate how many times a normally open contact was set off at the sensor output, and would thus know how many metal objects passed by the sensor.

Concepts normally open and normally closed contact ought to be clarified and explained in detail in the example of a PLC controller input and output. The easiest way to explain them is in the example of a relay.
PLC

Normally open contacts would represent relay contacts that would perform a connection upon receipt of a signal. Unlike open contacts, with normally closed contacts signal will interrupt a contact, or turn a relay off. Previous picture shows what this looks like in practice. First two relays are defined as normally open , and the other two as normally closed. All relays react to a signal! First relay (10) has a signal and closes its contacts. Second relay (11) does not have a signal and remains opened. Third relay (12) has a signal and opens its contacts considering it is defined as a closed contact. Fourth relay (13) does not have a signal and remains closed because it is so defined.

Concepts "normally open" and "normally closed" can also refer to inputs of a PLC controller. Let's use a key as an example of an input to a PLC controller. Input where a key is connected can be defined as an input with open or closed contacts. If it is defined as an input with normally open contact, pushing a key will set off an instruction found after the condition. In this case it will be an activation of a relay 0.

If input is defined as an input with normally closed contact, pushing the key will interrupt instruction found after the condition. In this case, this will cause deactivation of relay 0 (relay is active until the key is pressed). You can see in picture below how keys are connected, and view the relay diagrams in both cases.
PLC

Normally open/closed conditions differ in a ladder diagram by a diagonal line across a symbol. What determines an execution condition for instruction is a bit status marked beneath each condition on instruction line. Normally open condition is ON if its operand bit has ON status, or its status is OFF if that is the status of its operand bit. Normally closed condition is ON when its operand bit is OFF, or it has OFF status when the status of its operand bit is ON.

When programming with a ladder diagram, logical combination of ON and OFF conditions set before the instruction determines the eventual condition under which the instruction will be, or will not be executed. This condition, which can have only ON or OFF values is called instruction execution condition. Operand assigned to any instruction in a relay diagram can be any bit. This means that conditions in a relay diagram can be determined by a status of I/O bits, operational bits, timers/counters, etc.


author: Nebojsa Matic

Hopefully this article can add your insights.
Please follow me:

ShareTo
Share on Facebook Tweet this Share to Google Plus Stumble this article
CLOSE

Enter Your Email Address




All Labels

  1. ABB PLC
  2. Allen Bradley PLC
  3. Analog Input
  4. Android
  5. Android and PLC
  6. Android Bluetooth
  7. Automatic Gates using PLC
  8. Baldor PLC
  9. Battery Level Indicator using PLC Analog
  10. BMS
  11. Building Management System
  12. Car Ticketing Machine using PLC
  13. CIMON PLC
  14. Click Series PLC
  15. Computer Vision
  16. Computer Vision and PLC
  17. Control Seven Segment Display with PLC
  18. Conveyor Control Using PLC
  19. CPU PLC
  20. CV and PLC
  21. CX-One
  22. DCS
  23. DDC
  24. DELMIA V5
  25. DeltaV
  26. Digital Input
  27. DirectLogic PLC
  28. DirectSOFT PLC
  29. Eaton PLC
  30. Elevator with PLC Program
  31. EPICS PLC
  32. Fatek PLC
  33. Festo PLC
  34. Fieldbus
  35. Forex Trading and PLC
  36. FPGA PLC
  37. GE Fanuc PLC
  38. GP proface
  39. GX Developer
  40. Heater Controller with PLC
  41. Hitachi PLC
  42. HMI
  43. Honeywell PLC
  44. IDEC PLC
  45. Keyence PLC
  46. Koyo PLC
  47. LG PLC
  48. Lock Unlock Door Using PLC
  49. Logixpro PLC
  50. Maple OIT
  51. Matsushita PLC
  52. MELSEC A
  53. MELSEC Q
  54. Memory PLC
  55. Micro PLC
  56. MicroSmart PLC
  57. Mitsubishi PLC
  58. Mobile Application
  59. Modbus
  60. Modicon PLC
  61. Momentum PLC
  62. Motion Control
  63. National Instruments PLC
  64. Omron PLC
  65. OPC
  66. PAC
  67. Panasonic PLC
  68. Parking Information using PLC
  69. Password Using PLC
  70. PLC
  71. PLC and CNC
  72. PLC and Computer
  73. PLC and Facebook
  74. PLC and PC
  75. PLC and Servo
  76. PLC Battery
  77. PLC Beginner Guide
  78. PLC Book
  79. PLC Cable
  80. PLC Codesys
  81. PLC Companies List
  82. PLC Computers
  83. PLC Design
  84. PLC for 3 Movement
  85. PLC for Assembly Line
  86. PLC for Automatic Welding
  87. PLC for Binding Machine
  88. PLC for Cutting Machine
  89. PLC for Filling Machine
  90. PLC for Fountain Application
  91. PLC for Injection Molding
  92. PLC for Marking
  93. PLC for Packing
  94. PLC for Rotary Bottle Washing
  95. PLC for Snack Vending Machine
  96. PLC for Sorter Machine
  97. PLC for Water Treatment
  98. PLC Hardware
  99. PLC Hybrid
  100. PLC Information
  101. PLC Knowledge
  102. PLC Language
  103. PLC Link Model
  104. PLC Mitsubishi Download
  105. PLC Model
  106. PLC Modules
  107. PLC Simulator
  108. PLC Software
  109. PLC Supplier
  110. PLC Types
  111. PLC Wiring
  112. PLC WorkShop
  113. PLC-ANALYZER
  114. PLCSIM
  115. Power Supply for PLC
  116. Profibus
  117. ProSafe PLC
  118. Push ON Push OFF with PLC
  119. Quickpanel Operator Interfaces
  120. RTU
  121. RTU and PLC
  122. SAS
  123. SCADA
  124. Schneider PLC
  125. SHARP PLC
  126. Siemens PLC
  127. SINUMERIK CNC
  128. Small Modular PLC
  129. Standard Sequence Programming for PLC
  130. Substation Automation System
  131. Teco PLC
  132. Telemetry
  133. TEP PLC
  134. Texas Instruments PLC
  135. Timer Countdown with PLC
  136. Toshiba PLC
  137. Touch Screen PLC
  138. Traffic Light with PLC
  139. TWIDO PLC
  140. Types of PLC
  141. Unitary PLC
  142. Unitronics PLC
  143. VIPA PLC
  144. Vision PLC
  145. Weighing Machine Using PLC
  146. Yokogawa PLC
  147. Zelio PLC

Search This Blog

Loading...
Copyright © 2009- All Rights Reserved